Monday, March 17, 2014

Live in, retail unit refurbishment


 I worked on this one for about ten weeks. It was my first working/foreman role in London. i completed all carpentry works. These included a complete rip out of the existing build, raising the whole floor to give a 2.4m headroom in the basement, onsite window construction for the basement, stair case assembly and installation, all internal stud walls, staircase built ins, floors, doors, the cylindrical lobby area  and kitchen. I worked closely with the architect and interior designers as well as overlooking all the other trades. It was an extremely satisfying project.











The only reason i'm showing the tile work is because i built the framework for it. Its a shame I didn't get a good photo of the kitchen.

1 comment:

  1. I need to get my business refurbished. It's pretty old and needs updating. We had been using the old design as an attraction but it's dying off.
    John Bond | http://www.altran.com.au/services/refurbishment.php

    ReplyDelete